Work scheduled for Veteran’s Memorial Bridge
Posted by wlpo on July 31, 2011
More traffic headaches are expected on Veteran’s Memorial Bridge in Ottawa.
A construction company out of Galesburg is applying a sealer to the bridge surface Monday. During the job, flaggers will be directing traffic and at some points there will be lane closures.
The bridge work is expected to get done in a day.
Sorry, the comment form is closed at this time.