Route 251 bridge south of Peru reopens
Posted by wlpo on October 26, 2009
You’ll be able to take Route 251 between Oglesby and Peru again. IDOT says the bridge should be reopened by noon Monday.
The bridge over the Illinois River had been closed to traffic since late April for repainting. The old paint, which contained lead, was removed. A fresh coat of green paint was applied.
Sorry, the comment form is closed at this time.